[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"footer-services":3},[4,18,30,42,52,63,75,86],{"id":5,"name":6,"slug":7,"description":8,"icon":9,"points":10,"sortOrder":15,"createdAt":16,"updatedAt":17},1,"Land Development","land-development","Residential, commercial and industrial development — from two-lot infill to multi-hundred-lot master-planned communities.","land-plot",[11,12,13,14],"Residential subdivision design","Commercial & industrial development","Civil infrastructure design & documentation","Unlocking site development potential",0,"2026-06-22T09:23:11.946Z","2026-06-24T23:58:40.503Z",{"id":19,"name":20,"slug":21,"description":22,"icon":23,"points":24,"sortOrder":5,"createdAt":16,"updatedAt":29},3,"Stormwater Engineering","stormwater-engineering","All things stormwater management - water-sensitive solutions and best practicable options.","droplets",[25,26,27,28],"Detention & retention systems (tanks & ponds)","Water quality treatment - wetlands, swales, raingardens","Hydrological management and catchment planning","Water sensitive urban design","2026-06-24T23:58:40.504Z",{"id":31,"name":32,"slug":33,"description":34,"icon":35,"points":36,"sortOrder":41,"createdAt":16,"updatedAt":29},5,"Flood Engineering","flood-engineering","Catchment analysis, flood modelling and mitigation that de-risk sites and keep communities safe.","cloud-rain-wind",[37,38,39,40],"Catchment analysis and council engagement","Flood modelling and risk assessment","Flood plain and overland flow path asssessment","Mitigation and management plans",2,{"id":41,"name":43,"slug":44,"description":45,"icon":46,"points":47,"sortOrder":19,"createdAt":16,"updatedAt":29},"Earthworks Engineering","earthworks-engineering","Smart cut-and-fill strategies and 3D site levels modelling to find cost-effective solutions.","mountain",[48,49,50,51],"3D modelling for site earthworks","Cut & fill volume analysis","Design levels for final site layouts","Site management & erosion \u002F sediment control plans",{"id":53,"name":54,"slug":55,"description":56,"icon":57,"points":58,"sortOrder":53,"createdAt":16,"updatedAt":29},4,"Three Waters Engineering","three-waters-engineering","Stormwater, wastewater, and water supply network design and capacity assessment for resilient infrastructure.","waves",[59,60,61,62],"Network capacity assessments","Gravity and pressure sewer system design","Potable water and firefighting demand assessments","On-site wastewater and water supply management",{"id":64,"name":65,"slug":66,"description":67,"icon":68,"points":69,"sortOrder":31,"createdAt":16,"updatedAt":74},6,"Consenting","consenting","Resource consent, engineering approval and building consent support that surfaces civil risk early — no surprises.","file-check",[70,71,72,73],"Infrastructure Assessments Reports and Flood Risk Assessments","Engineering Approvals and Building Consents","Code of Practice and Building Code compliance","Land use and Subdvision Consent support","2026-06-25T02:48:21.944Z",{"id":76,"name":77,"slug":78,"description":79,"icon":80,"points":81,"sortOrder":64,"createdAt":16,"updatedAt":29},7,"Construction Monitoring","construction-monitoring","On-site oversight and CPEng certification that ensures works are built in accordance with the approved design.","hard-hat",[82,83,84,85],"Pre-construction, pre-pour & final inspections","Regular site monitoring & technical advice","Design variations & approvals","Council QA clearances",{"id":87,"name":88,"slug":89,"description":90,"icon":91,"points":92,"sortOrder":76,"createdAt":97,"updatedAt":98},8,"Contract Administration","contract-administration","Proactive and reliable contract administration services to support successful project delivery from tender through to construction and close-out.","notebook-pen",[93,94,95,96],"Tendering and procurement support","NZS 3910 contract administration (Engineer to Contract)","Contract documentation and schedules","Construction monitoring and council QA coordination","2026-06-24T23:58:28.777Z","2026-06-25T02:47:05.337Z"]